"Loading..."
Join the Burmon Revolution
FBC Code Approvals Click here

Project Estimate Calculator

  1. Select your Unit of Measure

  2. Enter the Length of your I-Joists

  3. Enter the Number of I-Joists per Floor

  4. Select the Floor Protection Required

  5. Hit Submit Button for your Calculation

feet
meters
Earthquake
Fire
Floor bounce & squeaks
Floor load sharing

Note: The project estimate calculations is based on the spacing guide table below:

Earthquake Protection

One double row 2 feet apart mid span plus one row every 2-3 feet apart

Fire Protection

One double row 2 feet apart mid span plus one row every 2-3 feet apart

Floor Bounce & Squeaks

One double row 2 feet apart mid span

Load Sharing

One double row 2 feet apart mid span

FLOORLOCK is currently available In the I-Joist Profile as shown below (16 inches on center)
Email us to place your order

Click here