Join the Burmon Revolution
Features
- Complies with AS/NZS Loading Codes
- Burmon Bracket locks into position at set out point
- No timber/steel crush on block work
- Rebar held in place, ready for concrete pour
- No moisture transfer from block work to truss
- No drilling through nail plate
- Bracket provides a clean, level surface
- Truss screww fixed for stronger, faster connection
- 24 kN and 42 kN Uplift Capacity options
1. Screw bolt and tighten![Screw J-Bolt and Tighten - Burmon Building Products](https://ik.imagekit.io/hll9qjza0/513.jpg)
Screw J-Bolt and tighten nut to BHBCON prior to concrete pour.
2. Position in place![Screw J-Bolt Position In Place- Burmon Building Products](https://ik.imagekit.io/hll9qjza0/514.jpg)
Position BHBCON at truss set out point prior to concrete pour
3. Screw truss![Screw Truss - Burmon Building Products](https://ik.imagekit.io/hll9qjza0/515.jpg)
Screw fix truss to BHBCON with screws supplied after concrete pour
Note: 400mm-long J-Bolt does not require to be under Rebar to achieve 24 kN of uplift.
![Shorten J-Bolt Lintel Installation - Burmon Building Products](https://ik.imagekit.io/hll9qjza0/516.jpg)
1. Shorten J-Bolt to depth of Lintel
2. Hook the rebar inside the J-Bolt in Bondbeam
Technical Info & Downloads
Note: DWG, EASM, STEP and EPRT 3d Models may be viewed using free EDrawings Viewer software
Download the EDrawings Viewer
Burmon Brackets for Concrete Masonry Tie Downs - product main AU
Technical IDs are not correctly set - check input